Wednesday 28 March 2018

Easter trip on Llangollen Canal (Wednesday 28/3/2018) - Grindley Brook to Burland

Engine hours start: 351.0 end: 357.8= 6.8 hours

Miles:11 Locks:9 & 3 lift bridges  Lock miles: 23 inc lift bridges!


Quite a long day today. Set off around 09:30.

Weather cold and windy all day. Some glimpses of the sun but never enough to get warm...

Trouble-free journey through the first 4 locks. The landlady of the Willeymoor Lock Tavern offered to shut the gates for me. Will definitely have to call in there one day!

For the first time ever in my experience, the Wrenbury Frith Lift Bridge was down! Difficult to operate as well as no bollards on the offside. Luckily a chap from the nursery took pity and lowered the bridge behind me. The main Wrenbury lift bridge was no problem. Got in a bit of a tangle at Wrenbury Church Lift Bridge trying to hold bridge open for following boat and nearly lost the chimney cap in the undergrowth...

Then slowly worked through Baddiley Locks and Swanley Locks. Had to turn most of them as I was following several boats. Following boat closed the gates on Swanley Locks for me.

Moored up in almost exactly the same place as last Friday but, obviously, facing the other way! Moored up and stove lit by about 16:30.

Realised that, after breakfast and mid-morning hot-cross bun, I forgot to have lunch again. Just shows how much eating is just habit...

No comments: